Mumbai Pune Missing Link

Mumbai, India

  •   Scale        8.5 Km
  •   Client       Navayuga Group
  •   Status      Ongoing
  •   Location  Mumbai, India
  •   Sector      Infrastructure

Techture has been involved in the complete BIM modeling, Quantity Estimation, 4D/5D simulation for the tunnel portion of the Mumbai Pune missing link. It is one of Asia’s longest tunnel with a complete length of 8.5 km along with various cross passages. The project will ensure that the existing six lanes on the stretch are widened into eight lanes.

Fenchurch Street Railway Station
Bus Station
Menu